Hanlon Mining | Mill No. 5 | Concentrate Expansion Project

Mill 5 Concentrate Expansion ProjectHE designed the installation of a new concentrate thickener and two new filter presses to increase output of Newmont’s existing gold Circuit.  HE designed three conveyor systems.  Included in this design was HVAC of the whole facility which consisted of packaged unit and forced air heaters along with large scale ventilation fans.  Additionally, HE designed all of the piping of both slurry and water.  This included analyzing the systems for new pumps, as well as examining the feasibility of utilizing existing pumps.  HEA also aided in the specification and procurement of all equipment for this project.