Hanlon Mining Carbon in Column (CIC) Process Plant
HE was asked to design a CIC process plant to be constructed at a new mine in Northern Nevada. During this effort, HE developed a complete 3D Model to be used for visualization and interference checks. Ultimately the model was used to generate 2D construction drawings. Click here for video.
Engineering Design Services included:
Hanlon Engineering Carbon in Column - CIC - Site
Hanlon Engineering Carbon in Column - CIC - Site
Hanlon Engineering Carbon in Column - CIC - Site
Hanlon Engineering Carbon in Column - CIC - Site
Hanlon Engineering Carbon in Column - CIC - Composite 02
Hanlon Engineering Carbon in Column - CIC - 3D Interior
Hanlon Engineering Roof Plan
Hanlon Engineering Carbon in Column - CIC (3D iso)
Hanlon Engineering Carbon in Column - CIC Project (section)
Hanlon Engineering Carbon in Column - CIC Project (plan view)